1. After transporting the machine to the exact position, the center
of the uncoiler must be determined. The straightener, feeder and
punch die are kept on the same material centerline.
2. Connect the power cable to the lower port of the three-phase
380V power switch to ensure that the power supply load is not less
than 5KVA, The press arm needs to supply 5Kgf/cm of compressed air
and ensure sufficient air supply.
3. Check the power supply wiring is correct, turn on the power
switch, the power indicator light is on, turn the automatic /
manual switch to the manual position, test the operation of each
machine, no abnormal reflection, hit the automatic position,
carefully observe whether there is any abnormal phenomenon.
4. Cut a piece of material, about 1 meter long, according to the
uncoiler input arc, put into the straightening machine, adjust the
front and rear straightening adjustment hand wheel, so that the
straightener wheel can contact the material.
5. Adjust the front straightening adjustment handwheel clockwise
and press the front part of the flattening wheel. The pressing
amount is about one to two thicknesses. Press the flattening button
to make the straightening machine move and observe the
straightening material. Flattening, if there is no flattening side
adjusted until the material is straightened
6. After the machine is adjusted, place the material on the
uncoiler, and then block the two sides of the material with
A-shaped iron (to prevent the material from loosening), then feed
it into the feeder of the leveler, and manually feed the material
through the straightening. The machine is sent to the punching die.
7. After the straightening is adjusted, adjust the sensing rod of
the uncoiler to the appropriate height, and adjust the outlet
sensing rod to the appropriate height to ensure the uncoiler is
discharged smoothly and the straightening is timely.
8. Turn on the feeder automatically. It can start working.
![]() |